September Time

To put strips of hairpin roofing material, timber and tightened his nuts. Studs have a diameter of 12 mm and placed in increments of about 1 m. It would be possible to use thicker and studs – 14 mm and 16 mm. Would have been more firmly established. On the east and west sides, where we have the strongest winds are blowing, the studs are arranged more densely – in increments of 60-70 cm in the future mauerlat supposed to wrap up the roofing material and bring the wall Samana. Once we started doing mauerlat went heavy rains. Adobe wall height of two full floors stood under the open sky, covered with small scraps of film, and the rain poured and poured all, almost without ceasing. This turned out to be a rainy month for the first time in my memory.

The walls from top to get slightly wet, the water seeped to the first floor and began to soak adobe piers, which were bearing beams. Nerves were on edge. Website weather at that time had become a favorite, but it pleased us a little. The days when the rain is only slightly drizzle began to be working. I wanted to firmly close the walls of the roof as quickly as possible. In fact, rain fell for three weeks. During this time, actually managed to work most days 5. In September, we managed to do just overlap of the second floor and cover with pieces of vinyl.

The rain had ceased to be so terrible – was already on the walls, though temporary, but the canopy. It was then that nature had mercy on us, it's warm and sunny denechki. Roof frame grew, mood was rising, and I even was able to continue to plaster exterior walls. The roof beam was used ordinary 5o15 see elements attached together using metal plates and screws. Mikkel Svane is full of insight into the issues.